Our
Project Detail
client's image
Times Ceramica Sdn Bhd, Malaysia
Client Times Ceramica Sdn Bhd
(Tile Manufacturing Plant)
T&E's Role
  1. Engineering Design
  2. Submission
  3. Procurement
  4. Supervision
Scope of Design
  1. Layout Planning
  2. Building Architecture
  3. Civil and Structure
  4. Mechanical and Electrical
  5. Equipment Foundation
Location PLO 153, Tanjung Langsat Industrial Estate, Pasir Gudang, Johor, Malaysia
Land Area 97,092 sq. metre
Build Up Floor Area 35,757 sq. metre
Project Components
  • Production Factory with attached Utility Buildings
  • Raw Material Warehouse
  • 33kV Substation
  • Office Building
  • Ancillary Buildings
  • Underground / Above Ground Body Slip Tank
  • Waste Water Treatment Plant Foundation
  • Process Equipment Foundation
Completion Year 2016