PT. Synergy Oil Nusantara, Indonesia
Client PT. Synergy Oil Nusantara
T&E's Role
  1. Engineering Design
Scope of Design
  1. Civil & Structure
Location J1, Raya Pelabuhan Kabil, KM 12.5 Kabil, Batam 29467, Indonesia
Land Area 100,450 m2(24.82 acre)
Build-up Floor Area
  • Phase 1 - 10,480.23 m2 (2.59 acre)
  • Phase 2 - 16,949.81 m2 (4.19 acre)
Project Components
  • Production Warehouse
  • Loading Bay
  • Refinery Plant
  • Hydrogenation Plant
  • Fractionation Plant 
  • Tank Farm
  • Pipe Gantry
  • Ancillary Buildings
Completion Year  Construction Stage